Skip to main content

Midyear Check-In: SFMTA Milestones in 2022

Midyear Check-In: SFMTA Milestones in 2022
By Erica Kato

Despite the ups and downs of COVID-19 in 2022, the SFMTA has been highly productive so far this year, keeping everyone moving and supporting San Francisco’s recovery from the pandemic. We increased Muni service in February and April, completed the Van Ness Bus Rapid Transit corridor and have moved forward with our quick-build program that help us reap the benefits of safe street design faster than ever, among other accomplishments.

As we head in to the second half of the year, we continue to think creatively and expedite processes and practices that have traditionally required long lead times. We’re proud to give an update on some of our projects with significant milestones happening before year’s end. There’s a lot to look forward to.

Photo of various Muni riders boarding a Muni Metro train in the subway

Muni riders in the subway

 

Here's a snapshot of what we’re currently working on:

Muni Service:

  • July 9, 2022: Muni service changes, including the restoration of the 2 Sutter (modified), 6 Haight-Parnassus, 21 Hayes (modified); to address changing travel patterns, modifying 23 Monterey, 28 19th Avenue, 43 Masonic, 49 Van Ness-Mission, 57 Parkmerced, 58 Lake Merced, L Bus. 
  • Fall 2022: Launch of Central Subway, realignment of rail service; service restoration and increased frequency to address changing travel patterns, as resources allow. 

Muni Forward Projects:

  • 29 Sunset Improvement Project outreach to begin 
  • J Church Improvement Project outreach to begin this summer to collect feedback on how to improve J Church. This fall, we will follow up with community on what we heard and what we propose to improve service and reliability on the J Church; late 2022 we will propose community-informed plan to MTA Board for approval  
  • K Ingleside planning with San Francisco County Transportation Authority underway 
  • M Ocean View Transit and Safety Project outreach underway 

Muni Metro Modernization:

  • Subway Renewal Program targeting strategic repair, replacement and enhancements continues with Fix It! Weeks scheduled for August and fall 2022 
  • Train Control Upgrade project goes to SFMTA Board for issuing request for proposal (RFP) in fall 2022 
  • Muni Metro Core Capacity Planning Study underway 

New Buses:

  • 30 El Dorado 32’ hybrid buses to be replaced by end of the year 
  • 9 of 12 electric buses delivered by end of year 
  • 30 Phase II LRV4 vehicles with accessibility improvements to be delivered by end of year 

Customer Experience Improvements:

  • Currently installing and testing new Customer Information System displays systemwide, focusing on neighborhoods identified by our Muni Service Equity Strategy.  
  • Upgraded system replacing the text-based system currently in use with one that uses a sophisticated, accurate vehicle arrival algorithm. Displays are larger and can display graphics. We are also implementing solar-powered signage.  
  • “Soft Launch” with several features will occur in September to support the opening of Central Subway, with more features released in December, and a public announcement in early 2023. Installation of new signage at transit shelters will be completed in January 2023.
  • Safety Equity Initiative to reduce and eventually eliminate gender-based harassment and violence on Muni underway 
  • System maps will be replaced systemwide for July 9 service changes along with station signage being replaced throughout the year

Vision Zero Quick-Build Projects:

  • Lake Merced Quick-Build: Outreach is completed, and project team is aiming for Board consideration to legislate in September, with implementation to follow. 
  • Bayshore Boulevard: Building on successful quick-builds already implemented from the Bayview Community-Based Transportation Plan, this project will continue to address safety needs in the area and has gone through a substantial portion of the outreach phase.  
  • Battery/Sansome: Aiming for MTA Board consideration and legislation this summer. 
  • Franklin Street: In response to a recent fatality in the project area, outreach is underway as of May for the quick-build concept. 
  • Hyde Street: This project builds on already substantial work in the Tenderloin including the recent project on Jones. Goal is to implement in 2023. 
  • Valencia Street: For this pilot project, the goal is to begin outreach in early July, implement and eventually study as an 18-month pilot.  

Capital Projects:

Woman riding in a protected bicycle lane with Muni buses and other vehicles in adjacent lanes

New Parking Protected Bike Lane on Folsom Street in South of Market Area

Please continue to check back and check back often! As projects come closer to completion, we will have in-depth updates on many of these improvements. Our staff has answered the call to serve, and we will continue to step up and keep San Francisco moving. We look forward to seeing you aboard Muni and taking a bike ride or stroll. Be sure to check out the rest of our website and sign up for our text and e-mail alerts for more details on the projects and programs you’re interested in.



Published July 12, 2022 at 04:47AM
https://ift.tt/0kcSryW

Comments

Popular posts from this blog

Show HN: Tape It, iOS recording app for musicians https://ift.tt/3udBTSi

Show HN: Tape It, iOS recording app for musicians Hello HN, Over the last 15 months, two friends and I developed the music recording app we felt we wanted based on our own needs as musicians. It's called Tape It [1] and has just recently hit the Apple App Store [2]. We put a lot of effort into a good UX to help musicians really focus on playing their instrument instead of pretending to be a recording engineer. The app records in stereo on newer iPhones (although that's a premium feature; the free version only records in standard mono audio quality). I would be really grateful for advice from this community on how to best approach marketing. We had a great TechCrunch article covering our launch [3], and we posted it on various music websites. Turns out advertising on Google or Apple Search is a dark art, though. We have some good ideas for developing a good social media presence, but they will take time. Please hit us with feedback, opinions and advice that you think a young ind...

Show HN: Moderator,lightweight peer4peer anon forum https://ift.tt/3fZSDGl

Show HN: Moderator,lightweight peer4peer anon forum hello all! here's a link to my little pinteresting like forum that stores no data on the server and uses IPFS for image storage. The design aesthetic is that everything would in 64kb of memory so we're going for a collapse-proof low bandwidth experience. this makes moderator really fast. https://moderator.rocks is the web preview, a flutter client is in the works at https://ift.tt/32wqdRb take a look, post something fun, ask questions. I'm also on twitter @moderatorium in case interested. Have fun! January 26, 2022 at 12:23AM

Show HN: Comment on live websites just like you comment on Google Docs/Figma https://ift.tt/GRhrjX0

Show HN: Comment on live websites just like you comment on Google Docs/Figma I'd love your feedback on this new JS plugin we launched. With this, you can comment on live websites just like you comment on Google Docs or Figma. You can use is to get Copy or UI feedback right on the website you are building. Feedback can be provided in rich formats like audio and video. You can get started by installing a JS tag in the footer of the website. You can then turn the review mode on or off on demand by adding “?review=true” to the URL. Demo video (43s): https://www.youtube.com/watch?v=cdnfBEw8TfI Demo video: https://www.youtube.com/watch?v=h6vxzXJuh8o https://ift.tt/ocLpdEu October 26, 2022 at 02:18AM